  • Gujarat Council of Education Research & Training (GCERT)

Gujarat Council of Education Research & Training  Location: Sector No.12, Gandhinagar,Gujarat.

Owner:  Director,GCERT,Government of Gujarat.  

Project: Gujarat Council of Education, Research & Training (GCERT) Building was completed in May 2004 having a built up area 6200 Smt. The building was earthquake resistance. This work was completed four month before time limit.

 

 

 

  •  Secondary Teachers Training Institute (STTI), Gandhinagar

Secondary Teachers Training Institute (STTI), Gandhinagar Location: Sector No.12, Gandhinagar, Gujarat.

Owner: Education Department Govrnment of Gujarat.

Project: Secondary Teachers Training Institute (STTI) Building was completed in March 2005 having a built up area 2000 Smt. The building was earthquake resistance. This work was completed four month before time limit.

 

 

 

  • Bapunagar Urdu School

Bapunagar Urdu School Location: Bapunagar,Ahmedabad.

Owner: Education Department,Govrnment of Gujarat.

Project: Bapunagar Urdu Primary School was completed in September 2007 having a built up area 2200 Smt. The building was earthquake resistance. This work was completed within time limit.

 

 

 

  • Diet Hostel

District Institute of Education & Training (DIET) Hostel Building Location: Sector No.12,Gandhinagar.

Owner: Director,GCERT,Government of Gujarat.

Project: District Institute of Education & Training (DIET) Hostel Building was completed in March 2005 having a built up area 2372 Smt. The building was seismic strengthen.The work was completed within time limit. 

 

 

  •  Anganwadi in rural Areas

Anganwadi in rural Areas Location: Sayla, Chotila, Limdi, Vadhwan, Dhrangadhra, Halvad, Patdi, Dasada & Lakhtar Block of Surendranagar District, Anjar, Mundra, Bhachu & Rapar Blocks in Kutch District.

Owner: Project implementation Unit Health Department Government of Gujarat.

Project: 130 Anganwadi was constructed in nine Blocks of Surendranagar District, four Blocks of Kutch District & completed in September 2007 having a total built up area 12140 Smt. The building was earthquake resistance. All locations are in rural areas. All the work was completed within time limit. This work give's clear image of our Construction Management.
                                   

  

  •  B.L.Mehta Primary School

B.L.Mehta Primary School

Location: Kathwada

Owner: Education Department Government of Gujarat.

Project: B.L.Mehta Primary School was completed in June 2003 having a built up area 2000 Smt. The building was earthquake resistance. This work was completed within time limit.

 

 

 

  •  Public Health Center in Rural Areas

Public Health Center in Rural Areas
Location: Lakhtar & Chuda Block of Surendranagar District, Mahuva Block in Bhavnagar District, Dhandhuka Block in Ahmedabad District.

Owner: Project Implementation Unit Health Department Govrnment of Gujarat.

Project: 4 Public Health Centers were constructed in two Blocks of Surendranagar District, One Block of Bhavnagar, & one Block of Ahmedabad District & completed in September 2007 having a total built up area 1440 Smt..The building ware earthquake resistance.All locations are in rural areas.All the work's completed within time limit.

 

 

  • School Building in Rural Area

School Building in Rural Area Location: All over Gujarat State

Owner: District Primary Education Programme & Sarva Shiksha Abhiyan Mission

Project: More than 500 school building completed in rural areas of Gujarat State.All these buildings are earthquake & cyclone resistance and completed within time limit. Total built up area 34659 Smt..

 

 

 

  • Staff Quarters-PIU

    Staff Quarters-PIU Location: Patdi, Limdi,Chuda,Dhranghdhra,Lakhtar Block of Surendranagar District & Viramgam, Dhandhuka Block in Ahmedabad District.

    Owner:Project implementation Unit Health Department Government of Gujarat.

    Project: 52 Staff Quarters ware constructed in five Blocks of Surendranagar District,two Blocks of Ahmedabad District & completed in September 2007 having a total built up area 3850 Smt..The buildings ware earthquake resistance.All locations are in rural areas.All the work ware completed within time limit.

 

 